The last date for submission of the bids for setting up 97.5 MWP (megawatt peak) grid connected rooftop solar PV system was April 30, 2019.from Moneycontrol Business News http://bit.ly/2UO3s0W
The last date for submission of the bids for setting up 97.5 MWP (megawatt peak) grid connected rooftop solar PV system was April 30, 2019.
Comments
Post a Comment